FieldCrew
  • Blog
FieldCrew
Pricing
Log inStart for $9

Monthly Labor Profit Report

Bayou Air & Heat

Houston, TX · February 2026 · 10 Techs

Guided walkthrough

Start with the Summary

This gives you the monthly picture fast: revenue, labor cost, margin, overtime, and the top-line recoverable profit.

Step 1 / 6

Summary

Total Revenue

$320,000

Total Labor Cost

$148,000

Gross Labor Margin

53.8%

Overtime Cost

$12,480

Unbilled Labor Hours

42

Recovered Profit Opportunity

$6,420

Overtime Breakdown

TechRegular HrsOT HrsOT CostPrimary Driver
Mike S.15243$1,806Callbacks
James R.16038$1,596Emergency calls
Carlos M.15635$1,470Overruns
Sarah K.16032$1,344Weekend install
David L.15830$1,260Callbacks
Tony W.16028$1,176Late finish
Jose P.16026$1,092Drive time
Chris B.16024$1,008Same-day add
Marcus T.16022$924Overspill
Lee N.16020$846Admin

Job Overruns (Top 10)

JobTypeEst. HrsActual HrsOverrun HrsLabor $ ImpactNotes
Westheimer Rd — InstallInstall811.53.5$403No parts staged
Main St — ServiceService24.22.2$253Return trip
Oak Ave — InstallInstall68.52.5$288Scope mismatch
Pine Rd — MaintenanceMaintenance1.53.82.3$265Additional repair
Elm St — ServiceService23.51.5$173No job code first visit
Cedar Blvd — InstallInstall10122$230Permit delay
Maple Dr — ServiceService1.531.5$173Return visit not attributed
Birch Ln — InstallInstall78.51.5$173Missing equipment
Willow Way — MaintenanceMaintenance23.21.2$138Drive time on job
Ash St — ServiceService121$115Callback same day

Leakage Sources

  • Uncoded time / missing job codes$2,180
  • Drive time logged to jobs$1,420
  • Return visits not attributed$980
  • Overtime stacking on overruns$1,840

Recovered Profit Explanation

The $6,420 recoverable monthly figure comes from identified leakage: uncoded or mis-attributed hours ($2,180), drive time incorrectly logged to billable jobs ($1,420), return visits not tied to original job codes ($980), and overtime that stacks on jobs that already overran estimate ($1,840). Addressing these with job-code enforcement, same-day OT visibility, and weekly overrun review captures margin that is currently leaking.

Recommendations (Next 30 Days)

  • Require job code to clock in — no job, no start.
  • Flag jobs >20% over estimate same-day so foremen can correct before month-end.
  • OT approval rule after 45 hrs to prevent stacking on overruns.
  • Weekly review: top 5 overruns with tech and foreman.
  • Price book adjustment for repeat overruns (e.g. scope or rate).

This is what’s happening in your business right now — ready to fix it?

Start tracking my jobs properlySee plan options

Takes less than 10 minutes to set up

Guided walkthrough

Start with the Summary

This gives you the monthly picture fast: revenue, labor cost, margin, overtime, and the top-line recoverable profit.

Step 1 / 6

FieldCrew

Job-based payroll intelligence for HVAC crews.

Product

  • Calculator
  • How it works

Solutions

  • For HVAC
  • For Contractors
  • For Small Teams

Company

  • About
  • Blog
  • Careers

Resources

  • Documentation
  • Support
  • Contact

Legal

  • Privacy
  • Terms
  • Security

© 2026 FieldCrew. All rights reserved.

TwitterLinkedInFacebookYouTube